The Iti Lane project will repair the storm-damaged coastal protection structure and restore safe pedestrian access to Cooks Beach. The works are intended to stabilise the damaged section of the rock revetment, protect nearby stormwater infrastructure and reduce the risk of further erosion.

Latest update: November 2026
 
 A temporary rock wall has been built and put in place to prevent any further erosion at this location. Security fencing is expected to be completed by the end of the month.
Work continues on planning and design for permanent repairs of the structure and improved beach access. Construction of these are expected to begin in early 2027.
 
Why is the work needed 

The beach access was damaged during Ex-Tropical Cyclone Vaianu in April 2026. Wave run-up travelled over the ramp and scoured material from behind the structure, causing the ramp, stairs and landing to slump. The damage has also exposed parts of the stormwater outlet and undermined the adjoining boundary fence.

What Council intends to do

Iti Lane 2.jpeg
  • Remove the damaged ramp, stairs, landing and loose concrete.
  • Rebuild the affected section of rock revetment, including improved geotextile, backfill and armour placement.
  • Construct new concrete stairs to restore pedestrian beach access.
  • Reinstate the ground behind the wall and repair the reserve surface.
  • Relocate the stormwater non-return valves to the manhole end of the pipes and protect the outlet ends within the rebuilt revetment.
  • Reinstate the adjoining area following construction. 

The existing concrete ramp will not be rebuilt. The ramp provided a pathway for wave run-up to travel behind the coastal structure and contributed to the damage. The replacement will provide stair access only.

Safety and access while work is planned

The damaged Iti Lane access will remain closed and temporary fencing and warning signs will be maintained. Interim protection is proposed around the damaged structure and adjoining fence. Council also intends to improve the alternative beach access approximately 125 metres west of Iti Lane and provide signs directing beach users to it.

What the community can expect

  • The Iti Lane access will remain closed until the site is safe and the permanent work is complete.
  • Construction activity will include demolition, excavation, movement and placement of large rock, concrete work and stormwater repairs.
  • Site fencing, public exclusion areas and warning signs will be used during construction.
  • Council will keep affected residents and the Mercury Bay Community Board informed as the design and construction programme is confirmed.